In Dubai, the process of Factory Acceptance Testing (FAT) follows a structured approach to ensure the quality and functionality of equipment or systems. Here are the typical steps involved in FAT in Dubai:
  1. Testing Plan Development:
    • Inspection Test Plan (ITP): A detailed ITP is created based on the equipment or system’s specifications and requirements.
    • Testing Activities and Criteria: The plan outlines all testing activities, procedures, acceptance criteria, reference documents, and intervention levels.. 
  2. Preparation Phase:
    • Documentation Review: Thorough review of all relevant documents, including specifications, design documents, test protocols, and acceptance criteria.
    • Testing Environment Setup: The testing environment is set up to closely replicate actual operating conditions, including power supply, connectivity, and specific environmental requirements.
  3. Testing Execution:
    • Conducting Tests: The equipment or system undergoes various tests per the ITP, such as functionality, performance, safety, reliability, and interface tests.
    • Recording Results: Each test is executed carefully, and results are recorded along with observations or issues.
    • Internal Testing and NOI: Typically, manufacturers or integrators conduct all necessary tests internally. Once results are satisfactory, a Notification of Inspection (NOI) is submitted to the customer for witness inspection, often involving a sample percentage of the quantities.
  4. Documentation and Reporting:
    • Maintaining Records: Comprehensive documentation is maintained throughout the process, including test protocols, results, issue logs, and corrective actions.
    • Final Test Report: A summary report of the FAT process, test results, and compliance with acceptance criteria is prepared.
  5. Client Review and Approval:
    • Client Involvement: Clients or their representatives review test results and participate in stage-wise or final inspections as per the approved ITP.
    • Issue Logging: Any identified issues or concerns are recorded in a punch list with categorized punch points.
    • Approval: Clients approve the equipment or system for the next phase (e.g., fabrication, packing, shipping, installation, or commissioning) upon clearing the punch lists.
  6. Follow-Up Actions:
    • Corrective Actions: Prompt implementation of corrective actions for any identified issues or deficiencies, which may involve re-manufacturing, retesting, adjustments, repairs, or modifications.
    • Non-Conformance Closure: Ensuring that all non-conformances are closed within the stipulated timeframe as per the contract.
  Effective communication, collaboration among stakeholders, and adherence to industry standards and best practices are crucial throughout the FAT process to ensure successful testing and acceptance of the equipment or system.   Agile and Hybrid PMC , Dubai is aware of criticality of each equipment’s and we supports companies by managing FAT on their behalf; Such as coordinating with suppliers, third-party inspectors, integrators, and other stakeholders to complete the FAT as per the approved ITP and FAT procedures, providing comprehensive reports in line with requirements.    Connect with Agile and Hybrid PMC , Your Trusted partner in Project Business, today for expert support in your FAT processes! 